Sign In | Join Free | My hardware-wholesale.com
China Qingdao Ruly Steel Engineering Co.,Ltd logo
Qingdao Ruly Steel Engineering Co.,Ltd
One-stop service for steel structure project
Verified Supplier

7 Years

Home > Steel Structure Workshop >

Prefab Workshop Steel Buildings With Mezzanine Steel Structure Fabrication

Qingdao Ruly Steel Engineering Co.,Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Prefab Workshop Steel Buildings With Mezzanine Steel Structure Fabrication

  • 1
  • 2

Brand Name : Ruly Steel

Model Number : Ruly0178

Certification : SGS, BV, ISO

Place of Origin : China

MOQ : 500 Square Meter

Price : USD29-USD99 Per Square Meter

Payment Terms : L/C, T/T, Western Union

Supply Ability : 20000 Square Meter Per Month

Delivery Time : 30 Days

Packaging Details : As request

Application : Steel Workshop Buildings With Mezzanine

Type : Prefab Steel Structure Workshop

Working scope : Design,Steel Structure Fabrication, Installation

Raw steel material : Q235B, Q355B, ASTM A36

Shot blasting level : Sa 2.5

Service life : 50 Years

Wall and Roof : Rock wool

Surface treatment : Painting

Contact Now

Prefab Workshop Steel Buildings With Mezzanine Steel Structure Fabrication

Project Information:

Prefab Workshop Steel Buildings With Mezzanine Steel Structure Fabrication. This is a Prefab Metal Workshop Buildings With Mezzanine. Welded H-section steel beams and columns are connented by high strength bolts to be the main frame structure. It also has partial mezzanine inside to store goods and provide office area. Galvanized steel floor deck is used for the mezzanine floor.All the steel structure are fabricated in our factory. Welded steel structure has good rigidity and light weight, which provides favorable conditions for production, transportation and installation.

Qingdao Ruly Steel Engineering Co.,Ltd is a professional steel structure fabrication and construction company for light and heavy steel structure Design, Manufacture & Installation.

Specification of steel structure material:

Item name

Specification Material Parameter Technical Treatment
Column H shaped steel Q235B,Q345B Paint or Hot dip galvanized
Beam H shaped steel Q235B,Q345B Paint or Hot dip galvanized
Bracing Steel rod,Steel pipe,Angle steel Q235B,Q345B
Purling C or Z shape, purling Thickness:1.8mm~3.0mm Q235B,Q346B Hot dip galvanized
Wall and roof panel EPS,Rock wool,Pu,Glass wool Sandwich panel or Single sheet. Steel T=0.426~0.8mm,insulation T=50~150mm Alu-zinc 150g, Fluorocarbon paint
Door Sliding or rolling door Steel or Aluminum sheet,T=1.0~1.5mm Paint or Hot dip galvanized
Window alloy-Glass,Aluminium alloy-shutter T=1.0~2.0mm Alloy
Lighting panel FRP, T=1.5mm or T=1.8mm Coefficient of thermal expansion:2.2x10-5/cm/cm/℃ Light transmittance 85%
Ventilator Turbine ventilator, and electric type Steel,stainless steel,PC Paint or Hot dip galvanized,304
Gutter Galvanized or stainless steel plate T=2.0mm Hot dip galvanized,304
Downpipe PVC pipe,Color steel pipe T=0.5mm Φ110,160,200 Paint
Bolt Ordinary, high strength 10.9S,4.8s Hot dip galvanized
Anchor bolt Steel rod M24,M27 M30 Q235B

Advantages of prefabricated steel structure buildings:

1 High strength and light weight Although the density of steel is larger than that of other building materials, its strength is very high. Under the same force, the steel structure has a small weight and can be made into a structure with a large span.
2 Good plasticity and good toughness The plasticity of the steel is good, and the structure will not suddenly break due to accidental overload or partial overload. The toughness of the steel is good, making the structure more adaptable to dynamic loads.
3 High degree of industrialization in production The steel structure is mainly produced in a specialized metal structure factory, so the production is simple and the precision is high.
4 Simple construction and short construction period All components are prefabricated at the factory, and the site is simply assembled, which greatly shortens the construction period.
5 Wind resistance and structural stability Steel structure construction with light weight, high strength, good overall rigidity and strong deformation ability
6 Saving construction costs The steel structure has light weight, reduces the basic cost, and has a fast construction speed. It can be completed and put into operation as soon as possible, and the comprehensive economic benefits are much better than the concrete structure.
7 Recyclable Steel can be recycled, less environmentally polluted when constructed and removed

How to install:

We will provide construction drawing for each project to guide installation. We will teach you the installation in our factory. We could dispatch our engineer to guide installation on site or we install it by our construction team.

Prefab Workshop Steel Buildings With Mezzanine Steel Structure Fabrication

Packing and transport:

All the structure components, panels,bolts and sort of accessories will bewell packed with standard package suitable ocean transportation and loaded into 40’HQ.

All the products are loaded at the loading site of our factory using crane and forklift by our skilled workers,who will prevent the goods to be damaged.

Prefab Workshop Steel Buildings With Mezzanine Steel Structure Fabrication


Product Tags:

steel structure factory building

      

metal workshop building

      
China Prefab Workshop Steel Buildings With Mezzanine Steel Structure Fabrication wholesale

Prefab Workshop Steel Buildings With Mezzanine Steel Structure Fabrication Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Qingdao Ruly Steel Engineering Co.,Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)